Embed on-site under NDA with Vibe Coding. Surface "waste, irregularity, overload." Ship the first working solution to production in 3–6 months. Show decision-makers something working at 1/10th the speed of an SIer.
Department-level win → company-wide rollout. Accumulate field knowledge, decisions, and workflows inside BOSWELL. As Palantir proved, once a system becomes operational infrastructure, no one rips it out (switching cost maxed out).
Take one flagship customer's success story to its industry peers. Brand as "the BOSWELL of [X] industry." Target the same economic structure as Palantir's Scale contribution margin of 68% (top 25% at 89%).
Business systems that take SIers 6 months — done in 1 week. Decision-makers see something working in the room and call GO / NO-GO on the spot. This is the only reason we beat both consultants and SIers. We implement the same principle as Palantir's 14-day deploy — in a Japan-spec, AI-coding-era form.